S.R.T. (regional road) 74 “Maremmana” improve safety from the km section 41+300 to the km 59+500

Direction Mobility, Infrastructures and Local Public Transport (in Italian Direzione Politiche Mobilità Infrastrutture e Trasporto Pubblico Locale).

Design and Realization of Regional Practicability in Pisa, Livorno, Lucca and Massa-Carrara. Drafting of the environmental impact study and all documents deemed necessary at the various stages of the Environmental Impact Assessment.

Description

The Company conducted a Preliminary Environmental Study in the specific field of the contract. The Study belong to the technical and economic feasibility project inclusive of binding and policy framework, and design and environmental framework complete with a development of specialistic topics such as:

• Preparation of the report concerning the acoustic impact assessment
• Elaboration of technical and supplemental contents for the atmosphere
• Landscape report (drawn up in accordance with the Dpcm of 12/12/2005)
• Environmental Impact Assessment (EIA)
• Plan of land and excavated rocks use

Ambiente

CONTACT US

We will get back to you as soon as possible.

CERTIFIED COMPANY
Favicon-tecnocreo

Viale Colombo 9 bis
54033 – Marina di Carrara (MS)
+39 0585 18 12 375
info@tecnocreo.it

FOLLOW US
tecnocreo-certificazioni-iso2
Associato-tecnocreo