Final design and environmental impact study
Agrivoltaic park on fixed structures, with a 36/220 kV step-up substation and a radial cable link to the transmission grid.
The project, under PNRR Mission 2 Component 2 Investment 1.1, concerns an agrivoltaic plant on fixed structures engineered to coexist with existing farming and grazing. It includes the new 36/220 kV step-up substation and the radial interconnection cable to the existing Codrongianos substation.
The multidisciplinary final design coordinated the specialist studies for the permitting process: environmental impact study for the state EIA with appropriate assessment of the special protection area, landscape studies, and a mitigation and restoration plan with decommissioning procedures and recovery of modules, aluminium and glass.
On the electrical side the design sized the generation park, network architecture, paralleling switchboards and inverters, power stations, user substation, cable route, earthing and auxiliary systems. Total works value is €153,383,587.

Project data
Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.