Final design with 132 kV connection
Final design of an agrivoltaic plant in the Veneto plain, with transformer cabins and grid connection at 132 kV.
The plant has a DC peak power of 47.114 MWp and an AC rated power of 44 MW, in the municipality of Mogliano Veneto, province of Treviso. It connects to the 132 kV line crossing the site, whose clearance corridor is respected by the layout.
The contribution covers the design of the photovoltaic plant and of the cabin electrical systems, including low-voltage switchboards: fit-out plan, architectural and electrical design of the delivery cabin, medium-voltage cable runs to the step-up transformer, earthing system.
The layout takes account of territorial constraints and of the buffer strips set by the municipal Plan of Works, so as to reconcile the arrangement of the module rows with continued farming.

Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.
> project sheetContact
Via Girolamo Savonarola, 15
54033 Marina di Carrara (MS), Italy