Civil and structural works for a storage plant
Design of the civil and structural works for the substation of a storage plant, from transformer foundations to the drainage system.
The assignment covers the civil and structural works of the electrical substation serving a battery storage plant at Rondissone, province of Turin, developed on behalf of the contractor.
The package includes the architectural design of the substation control building, the general layout of buried services and the stormwater drainage system, with soakaway trenches sized on the plant area.
The structural part covers the foundations of the medium and high voltage transformers and the substation bays, verified with seismic modelling developed specifically. Documents were issued in several revisions between February and April 2026.

Project data
Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.
> project sheetContact
Via Girolamo Savonarola, 15
54033 Marina di Carrara (MS), Italy