Final design and simplified authorisation procedure
Final design of a ground-mounted photovoltaic plant, with management of the PAS procedure and connection laid by horizontal directional drilling.
The project concerns a 2,560 kW rated ground-mounted photovoltaic plant in the municipality of San Miniato, province of Pisa, with works valued at €3,024,595.36, split between €1,567,913.29 of systems and €1,450,699.12 of structures. The assignment ran from January to May 2025.
Besides sizing the generation field and the connection cable to the reference cabin, the work included managing the entire Simplified Authorisation Procedure and the environmental and landscape study supporting the EIA exclusion declaration. The analysis of interferences with infrastructure and underground services led, to overcome specific morphological and infrastructure constraints, to an interconnection route by horizontal directional drilling, with no open-cut excavation.
Specialist services include the geological and geotechnical report, preliminary calculations of the steel module supports and cabin base structures, internal cable duct layout with excavation sections and volumes, the single-line diagram, earthing design and auxiliary lighting and CCTV systems. The design is completed by constraint mapping, landscape integration drawings, the priced bill of quantities and cost plan, the land parcel plan, the maintenance plan and the decommissioning and site restoration plan at end of life.

Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.