Detailed design and safety coordination
3,957 kWp plant on the top surfaces of a landfill in post-closure management, with no penetration of the capping.
The generator consists of 5,520 bifacial 720 Wp modules for 3,957.12 kWp peak, in 230 strings connected to twelve 300 kW inverters. Calculated yield is 5,838 MWh per year, equal to 1,469 kWh per kWp.
The governing constraint is the integrity of the capping: a topsoil layer of at least one metre, a half-metre drainage layer and a compacted mineral barrier with permeability not exceeding 1×10⁻⁹ m/s. The adopted solution avoids any penetration — two-post S355 steel structures resting on metal cages filled with stone, with a minimum ballast of 6,100 daN per structure — and was calibrated on twenty plate load tests and an electrical resistivity tomography.
Minimum environmental criteria are applied to steel, the main material with about 212 t of sections, and the ballast uses about 5,600 t of natural stone instead of concrete footings. Works value is €5,534,784. The design was verified under art. 42 of D.Lgs. 36/2023 and validated in June 2026.

Project data
Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.