Multidisciplinary final design for the EIA
103.029 MWp agrivoltaic plant integrated with a 160.3 MW electrochemical storage system and a 30/220 kV user substation, with radial 220 kV connection to the national transmission grid.
The project combines a 103.029 MWp agrivoltaic plant, equal to 94.8 MW rated, with a 160.3 MW rated battery storage system on a separate site and a new 30/220 kV user substation. The connection runs radially at 220 kV to an existing transmission grid substation, for a total of 257 MW injection and 157 MW withdrawal. Works value is €134,765,353.38, of which €120,547,317.48 in category IB.11.
The final design was developed for the environmental impact assessment under art. 23 of D.Lgs. 152/2006 and for single authorisation under art. 9 of D.Lgs. 190/2024. Besides sizing the photovoltaic field, the storage system and the connection cable, the work included the environmental and landscape study, analysis of interferences with infrastructure and underground services, the hydraulic study and the design of module and cabin support structures.
On the electrical and building services side the design covered earthing, lighting and CCTV systems and ancillary works; the design team included the safety coordinator for the design phase. Documents were issued between May 2025 and February 2026. The assignment was carried out in a consortium with other qualified companies.

Project data
Services delivered
Other projects
29.4 MW ridge wind farm, connected to the 132 kV transmission grid.
> project sheet
Design of a wind farm made up of 21 turbines and the associated connection works.
> project sheet
Construction and operation of a photovoltaic-agrivoltaic plant with a DC capacity of 49.38 MW.
> project sheetContact
Via Girolamo Savonarola, 15
54033 Marina di Carrara (MS), Italy