Bridge reconstruction site: crawler crane and formwork on the new pier

Environmental monitoring manager

Environmental monitoring of the Albiano Magra bridge

Environmental manager during and after construction for the rebuilding of the Magra bridge on the S.S. 330 road.

Appointment as Environmental Monitoring Manager, during construction and post operam, for the works «S.S. 330 – Rebuilding of the bridge over the river Magra at km 10+422 – Stage 2 – Detailed design of the new bridge and ancillary works».

Monitoring data are held in a territorial information system built on GIS technology, which supports environmental analysis of the critical features and the potential of the area concerned.

The work is organised in four steps: building the analytical territorial picture; defining the design objectives; monitoring in progress how design choices are carried out and managed, so as to identify deviations and introduce interim corrective action; and ex post assessment of the results, in terms of process efficiency and actual benefits for the area.

Project data

Sector
Environmental sustainability
Year
2020
Tecnocreo's role
Environmental monitoring manager

> back to projects

Services delivered

Surveys

Environmental monitoring

  • Human environment: air, noise, vibration
  • Water: surface water and groundwater
  • Natural environment: vegetation, soil and fauna
  • Physical setting: slope stability