Soil bioengineering and environment
Preliminary environmental study for the EIA screening procedure and detailed design of the soil bioengineering works.
Preparation of the Preliminary Environmental Study and the related specialist reports within the EIA screening procedure for the project «S.R.T. no. 69, right-bank Arno bypass – Lot 5».
In parallel, detailed design of the soil bioengineering, acoustic and environmental works for the right-bank Arno bypass on the Le Coste – Casello Valdarno stretch, lots 1 and 2.
Services delivered
Other projects
Detailed design of the priority eastern functional section, from the Tuscan border to Sarzana.
> project sheet
EIA of the feasibility design for a new bridge over the Arno and the connecting road.
> project sheet
Environmental impact study comparing four alignment options in the Valdinievole area.