Electrochemical storage
Battery energy storage plant rated 96 MW in the municipality of Larino (CB).
The project covers a battery energy storage system (BESS) rated 96 MW, to be built in the municipality of Larino, province of Campobasso.
The plant consists of modular electrochemical storage units with the equipment needed to store electricity and convert it bidirectionally to and from the national transmission grid. Its purpose is to offset the intermittency of solar and wind generation, stabilise the grid and make reserve available at peak demand or during interruptions.
Services delivered
Other projects
Detailed design of the priority eastern functional section, from the Tuscan border to Sarzana.
> project sheet
EIA of the feasibility design for a new bridge over the Arno and the connecting road.
> project sheet
Preliminary environmental study for the EIA screening procedure and detailed design of the soil bioengineering works.
> project sheetContact
Via Girolamo Savonarola, 15
54033 Marina di Carrara (MS), Italy