S.R.T.69

 

​The route of the variant to the SR69 originates with the construction of a new roundabout in loc. The Coasts and develops for about 1550 m in the direction of North - West ending with the roundabout junction with the SP 11 near the Valdarno motorway exit. 

Naturalistic, acoustic and 
environmental engineering

DEVELOPMENT OF INFRASTRUCTURE
 

S.R.T. n. 69 variant on the right bank of the river 
Arno - Lot 5



​Elaboration of the Preliminary Environmental Study Document and of specialized reports related to the procedures of eligibility to EIA related to the project “S.R.T. n. 69 variant on the right bank of the river Arno – Lot 5” and executive design of naturalistic, acoustic, environmental engineering interventions relative to the realization of the variant on the right bank of the river Arno of S.R.T 69 in the stretch Coste – Casello Valdarno (Lot 1 and Lot 2) 

Designers
TECNOCREO
Year
2018
Sector
INFRASTRUCTURE
Customer

REGIONE TOSCANA


  • Consulting
  • Permitting
  • Rendering
  • Environmental Monitoring and Monitoring:
    - anthropic sector: atmosphere, noise, vibration;
    - water sector: surface and groundwater;
    - natural sector: vegetation, soil and fauna;
    - physical planning of the territory: slope stability;
    - landscape: archaeological, architectural and landscape heritage.
  • Modelling  2d e 3d
  • Design

The route is essentially elevated, with an underpass at the intersection with the SP 59 and a bridge at the crossing of the Ciuffenna stream, and develops entirely on the right bank of the Arno. 